ブログ

Rough flowing of interior recovery and restoration construction work 

英語,スタッフブログ

Hello everyone! This is Office recovery and restoration Dot Com website blog personnel in charge.

Our company is an interior decorative finishing construction company professionally mainly at Ikebukuro area, Tokyo,

as the midpoint, in all over Kanto area, in charge of all of interior decorative finishing construction work,

such as LGS(=light gauge steel) work, board work, cloth・floor finishing work, and so on.

 

Last time, we explained the theme of what we have to do before starting recovery and restoration work. This time as for continuing from last time, we are explaining,

Rough flowing of recovery and restoration construction work.

 

You do not have to grasp all of the construction working situation on the way. However, if you should request this kind of construction work in the future,

we are happy if you will use this information as reference.

 

Besides, as for the topic on what is recovery and restoration on earth, we already uploaded separately(Sorry, only in Japanese website for this).

There are two main kinds of construction work on relative recovery and restoration work as follows:

・Interior demolition, disposal waste removing work to recover and restore up to the situation at the time of renting the office to leave out

・Recovery and restoration construction work of demolished・removed areas

 

We are explaining the above two points in due order respectively as follows:

石膏ボード解体の様子1

石膏ボード解体の様子1

 

Interior demolition, disposal waste removing work of recover and restoration up to the situation at the time of renting the office to leave out

 

Stopping lifeline, then, interior (demolition) contractor will finally start operation work.

Demolition removing operation work is going to be executed from here. However, let us explain more in detail as below.

 

・Demolition and removing of furniture, household goods

Property renter(=requester) will demolish and remove big furniture or household goods which could not be disposed.

If there are a lot of things around where should be recovered and restored, operation work efficiency may go down. So, we will demolish・remove, or temporarily place where is not used for construction work.

 

・Installment, construction work of foothold and curing place

After operation work site is becoming to be put in order, we finally execute curing , and install foothold.

床養生の様子

床保護のための養生の様子

Situation of curing for floor protection

ホコリ養生の様子

ホコリ養生の様子

Situation of dust eliminating cure on purpose

足場の例(写真右部)

An example of foothold (right side above picture)

 

Regarding curing, we explained in detail in our previous article.

 

Curing as above, we pay careful atttentions not to be hurt or dusty at public places, then we duly start operation work.

 

・Removing operation work of interior materials(interior demolition)

From here, we finally go on demolishing interior decoration.

Depending on its construction work scope and procedure too, we go on demolishing in the order of ceiling, wall, and floor.

In the case of office, it is often indispensable to change new fluorescent light, floor tile and so.

As we stress again here, please read and check the contract sheet well on this point.

If you should have requested demolition・restoration of unnecessary places afterwards, it may cost needless expense, and may also take time too.

In the case of removing floor tile, it often occurs stripping adhesive so called「chipping」work.

For this work, electric tool is often used, then loud soundvibration may occur.

As for hourly and daily schedule of this work stage, it seems that it is better to obtain understanding of confirming by fully explaining to neighborhood in advance.

 

Recovered and restored operation work of demolition・removing areas

At the stage of areas where property renter side added modification, and after completing demolition and removal with obligation of recovery and restoration areas, we finally start to go on eventually executing 「recover and restore」to「original situation」by carrying out  recovery and restoration work.

Depending on the contract too, if all items are included for recovery and restoration work, significant number of points should be recovered and restored, such as ceiling or wall board, cloth(or wall paper), lighting tool, floor mat, air-conditioner, door, blind・・・and others.

 

・Ceiling, wall, inside floor interior decorative materials, other recovery and restoration operation work

We go on executing recovery and restoration of demolished or removed areas.

As we also explained as above, also depending on the contract, wall cloth, fluorescent light, floor tile and others often come to be the object of recovery and restoration.

 

・Disposal of industrial waste(removal)

We go on moving out demolished materials, household goods waste which property renter could not move out, materials arisen at the time of operation work, and so on.

If it is an authentic work contractor, there is a definite rule of writing down as voucher, in accordance with manifesto system, describing「which demolition, going through what kind of route(or work contractor), where to be moved out」.

If relative industrial waste cannot be fully disposed at intermediate treatment facility, it shall be sent to final disposing place. So, manifesto from intermediate treatment facility contractor to final disposal contractor shall be issued separately too.

 

The property renter side does not necessarily have to grasp all of these. However, if waste treatment contractor happens to be dishonest(≒demolition contractor is dishonest), the chances of being lawfully punished will be high too, as construction work requester(=renter side) who pretends not to know request construction work on purpose.

You should watch out and be cautious to work contractor who will not hand a copy of manifesto to you.

If possible, it may be advisable if you obtain a copy and check the possible contractor too.

 

However, in the case of a construction work construction work contractor itself disposes final waste, or has facility to be able to store waste, manifest is going to be unnecessary.

It is relieving to be able to grasp to that extent when you actually request construction work.

 

Cleaning operation work after demolition, removal, and recovery and restoration of temporarily placed household goods or furniture and others

After recovered and restored by work contractor, dust or tiny trash may emerge naturally at work site more or less.

The work contractor will clean up those.

However, it differs according to work contractors, or its plan whether cleaning up operation work is still to be done by that construction work contractor,

or requesting other contractor, and cleaning up to what extent.

Normally, in often cases, the relative contract may be exchanged to both sides that including trash,

dust should be fully cleaned up and handed the property to the next renter or returned.

We recommend you to check in advance before renting property, to what extent cleaning up will be done.

 

After all is completed, we go on returning temporarily placed household goods and furniture for operation work.

Also in this case, if it is necessary to change layout of household goods, furniture or so from before operation work,

and altering disposal which is not the same as former situation, advanced meeting with the work contractor can make its actual work smoothly.

As a caution again, in order to diminish possible trouble and unnecessary cost・time spending too, considering above situation so far,

we recommend you to have enough meeting with property lender in advance.

 

Summary

This time, in the procedure of recovery and restoration construction work,

we have explained actual flowing of recovery and restoration construction work so far.

 

As a summary,

・Reading relative contract sheet well, and checking scope of recovery and restoration again

・Checking date and time, and volume to give out noisy sound・vibration in operation work, and taking necessary measures

・Checking removal of industrial waste, and layout of household goods and furniture

・Other checking if the recovery and restoration construction work details complying with property lease contract sheet

 

Confirming above all, which are all important. When contraction work starts, loud sound and dust may come out.

It may come to be difficult to have through meeting with the work contractor.

Therefore, we recommend you to check matters which is difficult to retrieve as early as possible.

Naturally, if you have any unclear point concerning the series of flowing, please also give your inquiry to our company light heartedly.

 

 

We are wholeheartedly updating Office restoration Dot Com official SNS!

※Clicking・tapping each icon, then automatically enter into link destination. We are waiting for your follow up!

 

At our Office restoration Dot Com website,

from personal residence, housing apartment, office, commercial facility tenant, hotel, school and so on, regardless of scale,

we are happy to receive your request of recovery and restoration construction work, and interior decorative finishing work.

Please be sure to contact our company for your quotation request, or consulting light heartedly.

 

Address: 〒171-0014

4th floor, Musashiya No.3 Building

62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

オフィスの原状回復ドットコムの公式SNS、鋭意更新中です! ※各アイコンクリック・タップでリンク先へ飛びます。 フォローお待ちしております!

オフィスの原状回復ドットコム

では、個人宅からマンションやオフィス、商業施設のテナント、ホテル、学校など規模を問わず、原状回復工事、内装工事を承っております。
お見積り、ご相談は是非お気軽に弊社までご連絡ください。

〒171-0014
東京都豊島区池袋2-62-10
武藏屋第3ビル4階

Webお見積もりはこちらへ