Hello everyone! This is Office restoration Dot Com website blog personnel in charge.

Our company is an interior decorative finishing construction company professionally mainly at Ikebukuro area, Tokyo, as the midpoint,

also in all over Kanto area, in charge of all of interior decorative finishing construction work,

such as LGS(=light gauge steel) work, board work, cloth・floor finishing work, and so on.

 

Continuing our article the other day, as the year end is drawing near too, this time, we will explain,

article the other day,

Importance of sorting waste

And I would like to state my personal opinion.

As for「curing」related to cleaning, please refer to our updated article the other day.

Firstly

For general family too, no matter where living in any location, it is an inevitable matter nowadays to sort waste.

Probably as it may seem to depend on quality of waste disposal facility, or kind of waste to be disposed at certain area, normally,

waste can be broadly sorted respectively as 「burnable」,「non-burnable」and「recyclable」.

Then, how is the situation at construction work site? Or, how it should be when relocating office, or shop or store? We will explain as follows:

 

On sorting waste at construction work site

In the first place, as for waste・・・disposal goods can be broadly sorted to two kinds in Japan.

As it seems that you may often hear, there are two kinds of waste as follows:

・Industrial waste

・General waste

Then, talking about the difference of the two,

 

「Industrial waste」

It is pointed as one of the 20 kinds regulated by Waste Disposal Law among waste materials arising along with business activities.

Manufacturing industry and construction industry, of course, if it is「one of the 20 kinds of items arisen along with business activities」,

it makes an industrial waste.

For example, as for manufacturing industry personnel, 「waste plastics arisen from manufacturing process」and the like meets industrial waste.

However, if pet bottles disposed after drinking at an office do not make industrial waste.

The reason is, it is not「industrial waste arisen along with main manufacturing activity」.

 

 

「General waste」

We do not touch it in detail this time here, however, to put it simply, it can be pointed「disposal waste besides industrial waste」.

As was arisen above example,「pet bottle waste after drinking」or the like is going to meet general disposal waste.

 

Then, what kinds are there 「industrial waste」arising from interior decorative finishing demolition?

 

Main kinds of industrial waste on interior decorative demolition

As for interior decorative demolition, the following are the roughly sorted waste kinds.

 

1.Wood chip

2.Board dust

3.Iron scrap

4.Mixed waste

 

  1. Wood chip

 

Literally, wood chip is a kind of waste arising from demolition・construction of wood material.

When demolished wood material of which partition is made up, or large scale wooden furniture or so, it is sorted as「wood chip」.

 

2.Board dust

 

Board dust is similar as above literally too, however, it is dust arisen from demolition・construction of gypsum board.

The above situation of under demolishing gypsum board. Stacking gypsum board used for ceiling・wall, then sorted and collected.

 

If the situation of gypsum board is good, it will be usually reformed, then used as gypsum board again.

It is also used for soil improving material or so, which is a kind of waste with highly reproduced property.

 

3.Iron scrap

Iron scrap often arises when demolishing LGS(=light gauge steel) regarding interior decorative construction work.

As you may imagine, its material is almost 100% recyclable, sorted and collected sufficiently.

 

4.Mixed waste

 

Mixed waste is also called「low waste」or so at construction work site.

In other words, it is pointed out as「other mixed dust which is too tiny to sort detailed」

As its sorting has not be possible, recycling is also impossible, so it often costs high for collecting it too. .

Probably, it seems that every construction work site contractor plans in advance in detail especially

when demolition and do best not to put out mixed waste, and go on sorting.

Our company is also definitely working on sorting not to put out mixed waste.

But, the more finely sorting waste, operation work efficiency will be the lower.

The balance over there may probably be considered difficult.

 

Like this, for all of repair・construction・demolition, it is understandable that sorting waste when puttingg it out is important.

Talking about demolition, it seems that there was an image of dynamic breaking before.

These days, of course for safety sake too, when breaking, we have to carefully go on demolishing same materials selectively, and go on fully sorting.

 

Then, for saving cost of requesting interior decorative construction work or restoration work, there is an important thing, which is,

「Sorting disposing goods by yourself as much as possible」

Naturally, because of sudden office relocation, or shop or store moving, it can not be realized.

Still, if there is enough preparing time period, please be sure to consider about it.

内装解体時に発生した産業廃棄物

 

Summary

This time, including relative pictures, we have so far explained the importance of waste sorting.

As it can be said for our whole society too,「whatever can be recycled, recycle it, and by sorting  disposal waste, reduce the whole amount」is important after all.

 

When requesting relocation of office, shop, or store, or restoring construction work, if you are in trouble of sorting waste,

or would like to reduce cost as much as possible, please give us inquiry light heartedly.

There may be more inexpensive and efficiently completing method than blindly demolishing your household goods or so.

 

For others, if you happen to have unclear point, or demand on interior decorative construction work, please give us your inquiry light heartedly.

 

 

 

We are wholeheartedly updating Office restoration Dot Com official SNS.

※Clicking・tapping each icon, then automatically enter into link destination. We are waiting for your follow up!

 

At our Office restoration Dot Com website,

from personal residence, housing apartment, office, commercial facility tenant, hotel, school and so on,

regardless of scale, we are happy to be receiving your request of restoration construction work, and interior decorative finishing work.

Please be sure to contact our company for your quotation request, or your consulting light heartedly.

 

Address: 〒171-0014

4th floor, Musashiya No.3 Building

62-10, 2-chome, Ikebukuro, Toshima, Tokyo

 

オフィスの原状回復ドットコムの公式SNS、鋭意更新中です! ※各アイコンクリック・タップでリンク先へ飛びます。 フォローお待ちしております!

オフィスの原状回復ドットコム

では、個人宅からマンションやオフィス、商業施設のテナント、ホテル、学校など規模を問わず、原状回復工事、内装工事を承っております。
お見積り、ご相談は是非お気軽に弊社までご連絡ください。

〒171-0014
東京都豊島区池袋2-62-10
武藏屋第3ビル4階

Webお見積もりはこちらへ